Pre-Startup Checks
Before turning on your system, complete these essential preparation steps:
Inspect the Installation
- Verify all plumbing connections are secure and properly tightened
- Confirm the bypass valve is in the correct position (service mode)
- Check that the drain line is properly connected and routed to an appropriate drain
- Ensure the brine tank (if applicable) is filled with the correct amount of salt
Electrical and Settings
- Confirm the unit is plugged into a grounded outlet
- Verify the control valve display is functioning
- Check that the time of day is set correctly on the controller
- Review regeneration settings match your household water usage
Water Supply Preparation
- Confirm the main water supply valve is accessible
- Open a nearby faucet to relieve pressure before startup
- Have towels ready in case of minor leaks during initial pressurization
Startup Sequence
Follow these steps in order to bring your system online:
- Step 1: Slowly open the inlet valve to allow water to enter the system
- Step 2: Listen for water filling the tank - this is normal
- Step 3: Open the outlet valve gradually once the tank is pressurized
- Step 4: Check all connections for leaks as pressure builds
- Step 5: Allow the system to run for 5-10 minutes to flush any loose media or air
- Step 6: Run water at the nearest faucet until it flows clear and steady
Post-Startup Verification
Confirm your system is operating correctly with these final checks:
Leak Inspection
- Examine all fittings, connections, and valves for moisture
- Check around the control valve head for any drips
- Inspect the drain line connection for proper flow during regeneration
Performance Testing
- Test water at multiple fixtures throughout your home
- Verify water pressure is consistent and adequate
- Check that hot water heater is receiving treated water
- Note the baseline reading on your water meter for future reference
Documentation
- Record the installation date and initial settings
- Save your system manual and warranty information in an accessible location
- Schedule your first maintenance reminder for 3-6 months out
Quick Reference Checklist
Print this summary for easy reference during startup:
- All connections secure and tight
- Bypass valve in service position
- Drain line connected and routed
- Electrical connected and display active
- Time and regeneration settings verified
- Inlet valve opened slowly
- Outlet valve opened after pressurization
- System flushed for 5-10 minutes
- All connections checked for leaks
- Water tested at multiple fixtures
- Installation documented